Test item 测试名称:
|
Water Closets Part1: Pans坐便器第一部分:本体
|
|
|
Test info测试内容:
|
Clause
|
Test Requirement
|
2
|
Design设计
|
2.1
|
Water seal水封高度
|
2.2
|
Fixing and support安装
|
3
|
Performance requirements操作要求
|
3.1
|
Full-flush: Paper discharge test全冲—手纸冲出测试
|
3.2
|
Reduced-flush: Paper discharge test小冲—手纸冲出测试
|
3.3
|
Solid discharge test固体冲落
|
3.4
|
Leakage and capability test泄漏与能力测试
|
3.5
|
Splash test飞溅测试
|
3.6
|
Wetting Test潮湿测试
|
3.7
|
Load safety test负载安全测试
|
3.8
|
Reduced-flush liquid contaminant test小冲液体污染测试
|
4
|
Marking and labels商标
|
Sampling Requirement: 2 sets of completed products with assembly instruction (if applicable)
|
样品要求:全套样品2套并包含安装说明书(如适用)
|
Turnaround time: normal (9 working days);express(7 working days)
|
所需时间:标准(9个工作日);加快(7个工作日)
|